Site Asset Management (SAM) Integration & Maintenance

The SAM2/SAU Hybrid or Energy Power Conservation Control (EPCC) function is an application used to conserve overall operational costs through intelligent remote power management.

The main objective of EPCC is to effectively cycle the BTS load between generator supply and battery bank supply.

In case of any non-functional SAM2/SAU on site, Laplace reports such site to operators to make provision for replacement. All other alarm sensors are inspected by Laplace and configured to serve their purpose. Laplace de-facto configuration for SAM2/SAU to monitor and control ATS is as follows:

  • Remote Start and Stop on ATS
  • Generator Faults Reset on ATS
  • Monitoring/Measuring of Voltage

Laplace monitors and clear any default on SAM2 configuration at any time.