Planning Optimization

Project Experience- February 2008 to December 2009

  • Globacom Nigeria RF Survey for Site Planning and Design-( 512 sites).
  • Coverage Optimization (Drive Test and Post Processing) for Multilink-Telkom CDMA network in Ondo, Osun and Kogi States (36 sites).
  • Ericsson 3G Network Optimization (Drive Test and Post Processing) for MTN Network: Asaba, Onitsha, Benin, Port Harcourt & Aba. ( 161 Sites).
  • Coverage Optimization (Drive Test and Post Processing) for Starcomms CDMA network in Uyo, Owerri, Sapele, Jos (45 Sites).
  • Zain Swap out Pre- and Post Drive Test and Optimization in North East Operations (133 Sites).
  • Technical Site Survey (RF, Tx and Civil) for Intercellular rollout (44 Sites).
  • Technical Site Survey (RF, Tx and Civil) for EMTS Phase 3 rollout (7 Sites).
  • Coverage Optimization (Drive Test and Post Processing-SSV and Cluster) for Globacom 2G network.
  • Globacom (206 Sites).
  • Coverage Optimization (Drive Test and Post Processing-SSV and Cluster) for MTN 3G network- Jos, Abuja, Kaduna and Kano Clusters-Managed Service-Ongoing.
  • Coverage Optimization (Drive Test and Post Processing) for EMTS network- Northwest Nigeria cluster.
  • Microwave Transmission Planning for Globacom rollout in Northern Ghana- 162 Hops.

Project Experience- January 2010 to December 2010

  • Globacom Nigeria RF Survey for Site Planning and Design-( 54 sites).
  • MTN Nigeria RF Survey for Site Planning and Design for Rural Telephony project ( 18 Sites).
  • Coverage Optimization (Drive Test and Post Processing) for Multilink-Telkom CDMA-EVDO network- nationwide (142 sites).
  • Huawei 3G Network Optimization (Drive Test and Post Processing) for MTN Network: Huawei Market Area. On-going since October 2009.
  • Coverage Optimization (Drive Test and Post Processing) for Starcomms CDMA-EVDO network- Nationwide (68 Sites).
  • Zain Swap out Pre- and Post Drive Test and Optimization in Northern Nigeria Operations (300 Sites)- On-going.
  • LOS Site Survey for EMTS rollout (166 Hops).
  • RF and Civil Preliminary Survey for EMTS rollout- ( 171 sites).
  • Globacom Swap-out ( Alcatel to Huawei) Pre- and Post Drive Test and Optimization in Abuja ( 270 GSM/EGPRS sites) in Abuja, Nasarrawa and Niger States.
  • Globacom Swap-out ( Alcatel to Huawei) Pre- and Post Drive Test and Optimization in Abuja ( 98 3G sites) in Abuja, Nasarrawa and Niger States-On-going.
  • Globacom Pre-swap survey ( Alcatel to Huawei) in Abuja, Niger and Nasarrawa ( 109 2G sites).
  • Globacom Pre-swap survey ( Alcatel to Huawei) in Lagos ( 96 3G sites).
  • Network Benchmarking for Zain network against (MTN, GLO, and ETISALAT) in major cities of Abuja, Lagos, Ibadan, Port Harcourt, Kaduna, Zaria, and Kano covering GSM, EGPRS and 3G technologies.
  • Coverage Optimization (Drive Test and Post Processing-SSV and Cluster) for Huawei-MTN WIMAX rollout in Kaduna, Ilorin and Warri. (50 Sites).
  • RF/Civil/Mw Combination survey and design for Bharti Airtel Rollout ( 323 sites).
  • RF/Civil Combination survey for Bharty Airtel Motorola-Huawei Swap in SS and SE region ( 271) sites.
  • Microwave LOS Survey for 3G Rollout for EMTS ( 107 Hops).
  • Microwave LOS Survey and Design for Globacom rollout and Swap-Nationwide (129 Hops.

Project Experience- January 2011 till Date

  • RF Survey and Design for Globacom 2G Rollout in Northern Nigeria ( 312 Sites).
  • RF Survey and Design for Globacom 3G Rollout in Nigeria (254 Sites).
  • CS and PS SSV Drive Testing for Globacom 2G Rollout ( 132 Sites).
  • CS and PS SSV Drive Testing for Globacom 3G Rollout (191 Sites).
  • Microwave LOS Survey and Design for Globacom 3G Rollout ( 17 Hops).
  • RF Survey and Power Audit for Airtel Existing Sites ( 412 Sites).
  • Pre-Swap Coverage Optimization for Airtel Motorola Swap (507 Sites).
  • RF/Mw/Civil Combination Survey and Design for Airtel 2G New sites ( 726 Sites).
  • Co-Location Site Audit for EMTS 3G Rollout ( 315 Sites).
  • Microwave LOS Survey and Design for EMTS 3G Rollout-(103 Hops).
  • CS and PS SSV Drive Testing for EMTS 3G Rollout ( 64 sites).
  • CS and PS SSV Drive Testing for EMTS 2G Rollout ( 35 Sites).
  • Microwave LOS Survey and Design and TSS for MTN ROADM Transmission Rollout (127 Hops).
  • CS and PS SSV Drive Testing for MTN Wimax Rollout ( 15 Sites).
  • Network Performance Management for MTN 3G RNO project-Abuja and Kano region.
  • Microwave LOS Survey and Design and TSS for MTN Cameroun Nationwide ROADM Transmission.
  • Rollout (132 Hops) –On-going.
  • CS and PS SSV Drive Testing for MTN Rural Telephony Rollout ( 85 Sites).